Per-machine and per-line energy metering
See electricity use by machine and by period, instead of one monthly bill total
Start by surveying the switchboards and the machines that use the most power, then assess where meters suit. The system reads the electricity meters on a schedule, keeps the history and reports by machine, line and shift as agreed with the customer.

Before the system
Before the system, electricity use is one plant-wide total once a month
Many plants know their electricity use from the monthly bill or a single main meter. They cannot say which machine uses the most, when equipment is left running with no production, or how energy per unit changes. Reading meters by hand only gives values for the moments someone looked.
The fix is not a meter on every machine, because that costs money and some points need a shutdown to install. First choose which points are worth measuring, and put energy figures beside production data. Otherwise you see numbers you cannot interpret.

Where the system helps
The system records power at chosen points continuously, beside production data
The concept shows a switchboard with DIN-rail power meters, a communication cable to a data gateway and a screen showing use per machine over time. The meters send readings over a standard industrial protocol to storage.
The project scope sets measuring points, reading intervals and report formats with the customer. Work inside switchboards is done by suitably qualified electricians. The system shows people the data, and decisions on running hours or investment stay with the customer.
How the work flows
- 01
Survey boards and machines
Review drawings, switchboards, existing meters and high-load machines.
- 02
Choose points and trial
Fit or connect the first meter, then compare it with the main meter.
- 03
Agree the reports
Settle the split by machine, line and shift, and who uses it.
- 04
Accept and review
Check trial reports with the responsible person before adding points.

What the starter set includes
The last item is assessed separately for each job; the others are in the starter set. The actual scope is set out in each project proposal.
- Power meters at points chosen in the survey, or reading existing meters if they can output data
- A data gateway and storage for the history
- Reports of electricity use by machine, period and shift
- Figures are for internal planning and do not replace the supplier's billing meter
Further development, per project
These are directions to assess and test per project. They are not part of the starter set.
Linking to output
Concept · to be assessed- What it does
- Bring in pieces or weight produced to calculate energy per unit.
- Benefit
- Shows whether use changed because of more work or because a machine is running worse.
- Must pass before use
- A reliable source of production data is needed, and the counting method agreed with production.
Idle running alerts
Concept · to be assessed- What it does
- Alert when a machine keeps drawing power during periods with no planned production.
- Benefit
- Helps find machines left on over breaks or outside shifts.
- Must pass before use
- Correct shift and production schedules are needed, and a supervisor must confirm before thresholds are set.
Peak demand view
Concept · to be assessed- What it does
- Show periods of high demand together with the machines running then.
- Benefit
- Supports decisions on moving some machines to other times.
- Must pass before use
- Real charges depend on your tariff class and the supplier's rates. Check against the bill and with whoever manages the electrical system before deciding.
Basic power quality
Concept · to be assessed- What it does
- Log voltage, current and power factor from meters that support them.
- Benefit
- Electricians have data before inspecting on site.
- Must pass before use
- In-depth power quality analysis needs specialist instruments and expertise.
Compressed air or water
Concept · to be assessed- What it does
- Add meters for compressed air, water or steam to the same screen.
- Benefit
- Shows the line's other energy costs.
- Must pass before use
- Meters must be chosen for pipe size and flow conditions, and the system may need to stop during installation.
Monthly energy report
Concept · to be assessed- What it does
- Produce a monthly report on the topics management or the energy team use.
- Benefit
- Less time compiling figures by hand.
- Must pass before use
- If it is needed for a legal or standards report, check the requirements with the recipient first.
Comparing ways of working
A comparison of ways of working, not measured before-and-after results.
| Topic | Usual approach | Proposed approach |
|---|---|---|
| Knowing your use | One monthly bill total | By machine and by period |
| Reading meters | Logged by hand on rounds | Read automatically on a set interval |
| Interpreting the figures | Unclear whether work or machines drove it | Set beside production and shift data |
| Investment decisions | Based on rough estimates | Before and after data to compare |
Where it fits
Suits plants where electricity is a major cost and you want to know which machine or line uses how much at different times.
Limits, and when it does not fit yet
If you want to cut the bill at once by replacing machines or adding solar, start with an energy auditor or that system's installer. If nobody will use the figures for decisions yet, agree the questions first.
What to prove before investing
- 01A list of switchboards and high-load machines, with electrical drawings if available
- 02A check of whether existing meters can output data or new ones are needed
- 03A comparison of sub-meter totals against the main meter during the trial
- 04Who will use the reports, and the questions the figures should answer
FAQ
Frequently asked questions
No. They are for internal planning. The billing meter belongs to the supplier, and the two sources can differ with meter accuracy and reading times.
It depends on the meter type and switchboard. Some current sensors are split-core and clip around a cable without cutting it, but work in a switchboard must be assessed by an electrician and scheduled with production.
No figure is given in advance. The system shows where power goes. Real savings depend on what you choose to change after seeing the data.
What to prepare before talking to us
You do not need all of it; start with what you have.
- A list of the machines to collect data from, with the PLC make and model if you know them.
- Photos of the control cabinets and the site.
- The forms or files you record on today.
- For inspection: sample parts or labels, both passes and fails.
Other products in this group
Production data kit and OEE dashboard
See where production time goes, using data that comes from the machine
Cold room and drying room temperature monitoring
Continuous temperature records instead of hand logging, with sensors placed from a room survey
Camera-based part measuring station
Measure repeated parts by camera instead of vernier, once tested on real work
In-line label and packaging inspection
Let a camera help check labels and codes on the line, once tested on real product
Remote pump and tank level monitoring
See pump status and water levels from afar, without driving out on every round
Send your machine list and a sample electricity bill
Attach a list of high-load machines, photos of the switchboards, a sample bill and the questions you want the figures to answer. The team will help define which points to measure first before agreeing scope.

