BT San Technology

Per-machine and per-line energy metering

See electricity use by machine and by period, instead of one monthly bill total

Start by surveying the switchboards and the machines that use the most power, then assess where meters suit. The system reads the electricity meters on a schedule, keeps the history and reports by machine, line and shift as agreed with the customer.

Discuss energy metering
Concept rendering: an open factory switchboard with several DIN-rail power meters, a communication cable to a data gateway, and a wall screen showing per-machine bar charts, with machines behind
Concept exampleConcept rendering of the system in use. Appearance and configuration depend on the proposed scope.

Before the system

Before the system, electricity use is one plant-wide total once a month

Many plants know their electricity use from the monthly bill or a single main meter. They cannot say which machine uses the most, when equipment is left running with no production, or how energy per unit changes. Reading meters by hand only gives values for the moments someone looked.

The fix is not a meter on every machine, because that costs money and some points need a shutdown to install. First choose which points are worth measuring, and put energy figures beside production data. Otherwise you see numbers you cannot interpret.

Concept rendering: a worker shining a torch on the main meter in an electrical room and writing in a notebook, with a clipboard hanging beside the meter
Concept exampleConcept rendering of the work on site before the system is in place. Not a photo from a real customer's site.

Where the system helps

The system records power at chosen points continuously, beside production data

The concept shows a switchboard with DIN-rail power meters, a communication cable to a data gateway and a screen showing use per machine over time. The meters send readings over a standard industrial protocol to storage.

The project scope sets measuring points, reading intervals and report formats with the customer. Work inside switchboards is done by suitably qualified electricians. The system shows people the data, and decisions on running hours or investment stay with the customer.

How the work flows

  1. 01

    Survey boards and machines

    Review drawings, switchboards, existing meters and high-load machines.

  2. 02

    Choose points and trial

    Fit or connect the first meter, then compare it with the main meter.

  3. 03

    Agree the reports

    Settle the split by machine, line and shift, and who uses it.

  4. 04

    Accept and review

    Check trial reports with the responsible person before adding points.

Concept rendering: an electrician's gloved hands clipping split-core current sensors around cables in a switchboard, beside a DIN-rail meter with a green status light
Concept exampleConcept rendering of where the system does its work. Not a photo from a real site. Appearance and configuration depend on the proposed scope.

What the starter set includes

The last item is assessed separately for each job; the others are in the starter set. The actual scope is set out in each project proposal.

  • Power meters at points chosen in the survey, or reading existing meters if they can output data
  • A data gateway and storage for the history
  • Reports of electricity use by machine, period and shift
  • Figures are for internal planning and do not replace the supplier's billing meter

Further development, per project

These are directions to assess and test per project. They are not part of the starter set.

  • Linking to output

    Concept · to be assessed
    What it does
    Bring in pieces or weight produced to calculate energy per unit.
    Benefit
    Shows whether use changed because of more work or because a machine is running worse.
    Must pass before use
    A reliable source of production data is needed, and the counting method agreed with production.
  • Idle running alerts

    Concept · to be assessed
    What it does
    Alert when a machine keeps drawing power during periods with no planned production.
    Benefit
    Helps find machines left on over breaks or outside shifts.
    Must pass before use
    Correct shift and production schedules are needed, and a supervisor must confirm before thresholds are set.
  • Peak demand view

    Concept · to be assessed
    What it does
    Show periods of high demand together with the machines running then.
    Benefit
    Supports decisions on moving some machines to other times.
    Must pass before use
    Real charges depend on your tariff class and the supplier's rates. Check against the bill and with whoever manages the electrical system before deciding.
  • Basic power quality

    Concept · to be assessed
    What it does
    Log voltage, current and power factor from meters that support them.
    Benefit
    Electricians have data before inspecting on site.
    Must pass before use
    In-depth power quality analysis needs specialist instruments and expertise.
  • Compressed air or water

    Concept · to be assessed
    What it does
    Add meters for compressed air, water or steam to the same screen.
    Benefit
    Shows the line's other energy costs.
    Must pass before use
    Meters must be chosen for pipe size and flow conditions, and the system may need to stop during installation.
  • Monthly energy report

    Concept · to be assessed
    What it does
    Produce a monthly report on the topics management or the energy team use.
    Benefit
    Less time compiling figures by hand.
    Must pass before use
    If it is needed for a legal or standards report, check the requirements with the recipient first.

Comparing ways of working

A comparison of ways of working, not measured before-and-after results.

TopicUsual approachProposed approach
Knowing your useOne monthly bill totalBy machine and by period
Reading metersLogged by hand on roundsRead automatically on a set interval
Interpreting the figuresUnclear whether work or machines drove itSet beside production and shift data
Investment decisionsBased on rough estimatesBefore and after data to compare

Where it fits

Suits plants where electricity is a major cost and you want to know which machine or line uses how much at different times.

Limits, and when it does not fit yet

If you want to cut the bill at once by replacing machines or adding solar, start with an energy auditor or that system's installer. If nobody will use the figures for decisions yet, agree the questions first.

What to prove before investing

  1. 01A list of switchboards and high-load machines, with electrical drawings if available
  2. 02A check of whether existing meters can output data or new ones are needed
  3. 03A comparison of sub-meter totals against the main meter during the trial
  4. 04Who will use the reports, and the questions the figures should answer

FAQ

Frequently asked questions

What to prepare before talking to us

You do not need all of it; start with what you have.

  • A list of the machines to collect data from, with the PLC make and model if you know them.
  • Photos of the control cabinets and the site.
  • The forms or files you record on today.
  • For inspection: sample parts or labels, both passes and fails.
Fill in the contact form

Send your machine list and a sample electricity bill

Attach a list of high-load machines, photos of the switchboards, a sample bill and the questions you want the figures to answer. The team will help define which points to measure first before agreeing scope.

Discuss energy metering

Or talk to the team directly

Phone
083-515-9824
LINE
@Bankoos

Add us on LINE

Scan with the LINE app on your phone

QR code to add LINE @Bankoos

LINE ID: @Bankoos

Open LINE on this computer