BT San Technology

Machine abnormality alert system

Spot a machine drifting from its usual state once its normal values are known

Start with a pilot machine. Fit sensors for vibration, temperature or current, learn the machine's normal values, and alert the maintenance team when readings drift so they can inspect.

Discuss a pilot machine
Concept rendering: a white motor and pump on a shared base, with round sensors mounted on the casings, cables running to a data box on the wall, and a stand-mounted screen showing a trend graph and status
Concept exampleConcept rendering of the system in use. Appearance and configuration depend on the proposed scope.

Before the system

Critical machines are usually looked after by walk-rounds and personal experience

Technicians walk the rounds on motors, pumps and fans, checking by touch and sound and noting results on a form. Symptoms that appear between rounds may go unseen, and the notes are hard to compare over time.

Normal values differ from machine to machine and shift with load and season. Fixed thresholds may raise false alerts until people stop paying attention, so the real machine must be observed before thresholds are set.

Concept rendering: a gloved worker pointing a handheld thermometer at a motor while holding a clipboard with a checklist, beside a row of motors and pumps
Concept exampleConcept rendering of the work on site before the system is in place. Not a photo from a real customer's site.

Where the system helps

Fit sensors to the machine, record normal values, and alert the maintenance team on change

The concept image shows a motor and pump with sensors mounted on the casing, cabled to a data transmitter box, and a screen showing a trend graph with the machine's status.

The system only raises alerts. The maintenance team inspects and decides what to do with the machine. Scope is set after a survey, including mounting positions and who receives alerts.

How the work flows

  1. 01

    Survey machine and area

    Check mounting positions, safety and network signal.

  2. 02

    Install and record baseline

    Fit sensors and record normal running before alerts start.

  3. 03

    Set thresholds with the team

    Agree thresholds, recipients and the alert channel together.

  4. 04

    Review and accept

    Go through the alerts with technicians and adjust before acceptance.

Concept rendering: a round sensor mounted on the motor housing near the shaft end, its cable routed along a blue bracket, with a screen behind showing a trend graph and a status bar
Concept exampleConcept rendering of where the system does its work. Not a photo from a real site. Appearance and configuration depend on the proposed scope.

What the starter set includes

The last item is assessed separately for each job; the others are in the starter set. The actual scope is set out in each project proposal.

  • A pilot machine chosen together with the maintenance team
  • Sensors and a data transmitter fitted to the machine
  • A normal-baseline period before alerts are switched on
  • Using PLC data alongside is assessed separately for the existing system

Further development, per project

These are directions to assess and test per project. They are not part of the starter set.

  • Open repair work orders

    Concept · to be assessed
    What it does
    Pass an alert to a work order in the maintenance system or ERP.
    Benefit
    Less re-keying once the maintenance team accepts the alert.
    Must pass before use
    An approver must confirm before a work order opens, and the existing system's connection must be checked first.
  • Vibration frequency analysis

    Concept · to be assessed
    What it does
    Look at vibration frequency patterns at the bearing to support inspection.
    Benefit
    Gives technicians extra information when inspecting.
    Must pass before use
    Must be tested with the real sensor and mounting. Results are supporting data and technicians still inspect.
  • Extend to other machines

    Concept · to be assessed
    What it does
    Add machines using the same normal-baseline steps.
    Benefit
    Reuses the approach tried on the pilot for the next machine.
    Must pass before use
    Each machine needs its own baseline, and network signal in the new area must be checked.
  • Cause and fix library

    Concept · to be assessed
    What it does
    Record the causes and fixes technicians confirm next to each alert.
    Benefit
    Makes it easier to review past alerts against what really happened.
    Must pass before use
    Record format must be agreed with the maintenance team, and someone made responsible for entering it.
  • Link to SCADA

    Concept · to be assessed
    What it does
    Send alert status to display in the existing SCADA system.
    Benefit
    Operators see machine status on the same screen as production.
    Must pass before use
    Data format, connection permissions and the existing system's owner must be checked first.
  • Thresholds by production run

    Concept · to be assessed
    What it does
    Separate normal values by product or by the load the machine runs.
    Benefit
    Fewer alerts caused by ordinary changes of job.
    Must pass before use
    A signal showing the production run is needed, and enough normal data per run must be collected.

Comparing ways of working

A comparison of ways of working, not measured before-and-after results.

TopicUsual approachProposed approach
Noticing symptomsWait for the next walk-roundSee each machine's trend continuously
Setting thresholdsA shared default valueNormal values recorded from that machine
Who decidesDepends on each person's experienceThe maintenance team inspects and decides
Routine inspectionThe only method usedKept, with the system as extra data

Where it fits

Suits critical machines whose stoppage affects production and that run steadily enough to have a normal pattern.

Limits, and when it does not fit yet

If a machine runs too unevenly to have a normal pattern, or nobody is responsible for responding to alerts, start with a routine inspection plan and named owners.

What to prove before investing

  1. 01A normal running period long enough to learn from
  2. 02Alert thresholds agreed with the maintenance team
  3. 03A review of false alerts together with technicians
  4. 04A safe mounting position that respects the maker's conditions

FAQ

Frequently asked questions

What to prepare before talking to us

You do not need all of it; start with what you have.

  • Sample documents or data for the system to read, with personal data removed first.
  • Common questions or cases with their correct answers, used to check results in the pilot.
  • Your data rules, such as whether data may leave the company.
  • For machine monitoring: the readings already taken and any breakdown records.
Fill in the contact form

Send details of a critical machine to start the survey

Tell us the machine type, its location and any past symptoms. The team will help define what to survey before choosing the pilot machine.

Discuss a pilot machine

Or talk to the team directly

Phone
083-515-9824
LINE
@Bankoos

Add us on LINE

Scan with the LINE app on your phone

QR code to add LINE @Bankoos

LINE ID: @Bankoos

Open LINE on this computer