What Is OEE? Formula and a Worked Example from a Sample Production Line

By ยศกร จิรพงศานานุรักษ์, Founder · 14 min read · Automation

Illustration: a display above a packaging line shows three bars for run time, speed and good output, and one combined bar shorter than all three
AI-generated illustration

OEE (Overall Equipment Effectiveness) is an index that shows how fully a machine is used compared with its potential. It is calculated by multiplying three parts: Availability × Performance × Quality. An OEE of 100 percent means producing only good parts, at full speed, with no stops at all. In the real world, world-class factories sit at around 85%.

The three components of OEE

  • Availability = actual running time ÷ planned running time (measures the impact of downtime)
  • Performance = actual speed ÷ standard speed (measures slow running and micro-stops)
  • Quality = good parts ÷ total parts produced (measures defects and rework)

Step-by-step OEE calculation example

Suppose one 8-hour shift (480 minutes) has 420 minutes of planned running time (after deducting a 60-minute break):

  1. The machine is down for 30 minutes due to a breakdown, leaving 390 minutes of actual running → Availability = 390/420 = 92.9%
  2. At the standard speed of 60 pieces/minute it should produce 23,400 pieces, but actual output is 19,500 pieces → Performance = 19,500/23,400 = 83.3%
  3. Of the 19,500 pieces, 300 are defective → Quality = 19,200/19,500 = 98.5%
  4. OEE = 92.9% × 83.3% × 98.5% = 76.2%

Tip: don't focus only on the overall OEE number. Look at which component is lowest. In this example it is Performance (slow running), which often comes from small micro-stops that nobody records.

What OEE counts as good

  • World-class: roughly 85% and above
  • Generally acceptable level: 60–70%
  • Below 60%: a lot of room for improvement, often unrecorded downtime or micro-stops

How can OEE be measured automatically?

The biggest problem is that manual data collection is late and incomplete. A more accurate method is to pull signals directly from the PLC (piece count, run/stop status) into a real-time dashboard, and have operators select the cause of downtime on a screen. This shows the OEE of every line immediately and allows analysis of past data.

Frequently asked questions

What is the difference between OEE and TEEP?

OEE is measured against planned running time, while TEEP is measured against the full 24 hours, including time when production was not planned. TEEP is therefore always lower than OEE, and it is used to look at the potential for expanding production capacity.

What OEE target should we set?

Don't set a vague target. Measure a real baseline first for 2–4 weeks, then aim to improve the lowest component by 5–10% at a time. This gives faster, measurable results.

Do we need a large investment to measure OEE?

Not necessarily. You can start by feeding existing PLC signals into an open-source system and already see results.

References

  1. Overall equipment effectiveness (Wikipedia) (accessed 2026-11-21)
  2. Calculating OEE (OEE.com) (accessed 2026-11-21)
  3. OEE Six Big Losses (OEE.com) (accessed 2026-11-21)
  4. World-Class OEE (OEE.com) (accessed 2026-11-21)
  5. Overall Equipment Effectiveness (LeanProduction.com) (accessed 2026-11-21)
  6. Total productive maintenance (Wikipedia) (accessed 2026-11-21)

Add us on LINE

Scan with the LINE app on your phone

QR code to add LINE @Bankoos

LINE ID: @Bankoos

Open LINE on this computer