By ยศกร จิรพงศานานุรักษ์, Founder · 6 min read · Automation

The shortest summary: SCADA (Supervisory Control and Data Acquisition) monitors and controls machines in real time, while MES (Manufacturing Execution System) manages the production workflow of the whole line, such as work orders, traceability and OEE. Put simply, SCADA answers "what state is the machine in right now?", while MES answers "how far along is this job, which material lot was used, and what is the quality?"
Where do SCADA and MES differ?
- Time scope: SCADA works in seconds/milliseconds (real time), while MES works at the level of orders, shifts and days
- Goal: SCADA = see and command the machines; MES = run production to plan and make it traceable
- Data: SCADA reads tags from PLCs/sensors; MES ties data to work orders, BOMs, lots and people
- Users: SCADA = operators and line control engineers; MES = planners, shift leaders and the quality department
What does SCADA do?
SCADA is the layer that talks directly to PLCs to display status and command machines. It generally consists of:
- HMI/dashboard showing the live value of every tag (speed, temperature, status)
- Alarm management that warns when a value goes out of range
- Historian that stores historical trends for analysis
- Remote control to start/stop and change setpoints from the control room
What does MES do?
MES sits one layer above SCADA. It turns the production plan into real actions on the shop floor and keeps a record of every step:
- Receives work orders from the ERP and distributes them to the lines
- Traceability: records which material lot, which machine and which person was involved for each piece
- Calculates OEE and downtime by cause
- Quality management: records defects and puts problem lots on hold
ISA-95: Which level are SCADA and MES on?
The ISA-95 standard divides factory systems into 5 levels, which helps show who talks to whom:
- Level 0: the physical process (sensors/motors)
- Level 1: control devices (PLC)
- Level 2: SCADA/HMI, monitoring and control
- Level 3: MES, production management
- Level 4: ERP, business management
A point where Thai factories often go wrong is skipping levels, for example buying an ERP first while the shop floor has no SCADA/MES feeding it data. The ERP then holds only hand-entered numbers, which often do not match reality.
What should a factory start with?
If you have nothing yet, always start with SCADA, because you need to see real data from the machines before you can manage them. Once SCADA has all its tags and the historian is stable, build on it with MES to tie the data to work orders and traceability. Most factories take roughly 1–3 months for SCADA and then add MES when ready.
Frequently asked questions
Can SCADA replace MES?
Not entirely. SCADA is strong at real-time work but is not designed to tie in work orders, BOMs and lot-level traceability, which is MES work. A small factory may use SCADA plus supplementary reports at first and move up to MES later.
Do we need an ERP before doing MES?
Not necessarily. MES can work by receiving work orders manually or from files first, and connect to the ERP later when ready.
Is it worthwhile to use open source for SCADA/MES?
It can be, for many SMEs. We use Node-RED and ThingsBoard (Community Edition), which are open source, and Ignition, which is commercial software sold under licence. Compare the licence cost of each option for your own project. All of them connect to PLCs of the major brands through OPC UA/Modbus/MQTT.