Demo data
One data set, explained for line staff, engineers and the CEO
The AI reads millions of rows of factory data, finds where the problem comes from, and writes each reader a summary in the terms they decide in. Pick an example below and compare the three summaries.

Machine stops
The data the AI reads
Demo dataSensor logs from 4 machines, every 10 seconds for 6 months: about 6.3 million rows of machine state, air pressure, temperature, shift and stop reason
Show as a table
| Month | Machine 3 | Average of 1, 2, 4 |
|---|---|---|
| Jun | 18 | 6 |
| Jul | 22 | 7 |
| Aug | 25 | 5 |
| Sep | 21 | 6 |
| Oct | 27 | 7 |
| Nov | 24 | 6 |
What the AI does with this data
- 1Pulls every machine's log into one place, in time order
- 2Finds every stop and looks at what happened just before it
- 3Finds what keeps showing up together, such as low air and the night shift
- 4Writes a summary for each reader; your own people check it before it goes out
One finding, three summaries

Line staff
Reads it on the screen by the machine or in LINE before the shift
Machine 3 stops the most, and 7 in 10 of its stops happen on the night shift
- stops on the night shift
- 7/10
- bar: the air reading to watch
- 5.5
- Before the night shift starts, read the air gauge on machine 3
- If it is below 5.5 bar, call maintenance before running
- When it stops, tap the reason on the screen instead of filling in a sheet
What to do: a one-minute air check before each shift

Engineer
Reads it on the dashboard, with the raw data one click away
104 of 137 stops (76%) on machine 3 came within 20 minutes of line air pressure dropping below 5.5 bar
- stops in 6 months
- 137
- followed low air pressure
- 76%
- min average per stop
- 38
- From 22:00 to 02:00 air pressure averages 0.6 bar lower than in the day, when the next line starts up at the same time
- Machines 1, 2 and 4 share the same air line but sit closer to the compressor, so they stop less
- The data shows the two happen together; that is not yet proof of cause. Trial a buffer tank at machine 3 for two weeks and measure again
What to do: check the air line for leaks and trial a buffer tank

CEO
Reads it in a one-page summary at the end of each month
Machine 3 loses about 14.5 production hours a month, roughly 87,000 baht a month
- hours lost per month
- 14.5
- baht per month
- 87,000
- months to pay back
- ~3
- The main cause looks like the air supply, not the machine itself or the people
- Fixing the air supply and adding an alarm costs about 180,000 baht. If stops fall as the data suggests, it pays back in about 3 months
- Engineering asks for a two-week trial before buying, to confirm the numbers
Decision needed: approve the two-week trial
Before you read the numbers
- Every number on this page is demo data we made up. It is not from any customer.
- The AI shows what happens together; it cannot prove the cause. An engineer still trials a fix and measures again.
- In a real project the data can stay on your own server, and someone on your side checks every summary before it goes out.
A rough look at the payback
Enter the manual work or losses you have today, and this estimates what a system could save.
- Saved per month
- 9,743 ฿
- Saved per year
- 116,910 ฿
- Work hours freed per month
- 65
An estimate from your inputs only, not a quote or a promise. The team works out real figures with your site.
Send these numbers to the teamHave something you want to build?
Tell us your goal and how you work today, and our team will help find the right approach.